Progress Update on Our Tiny House Build
Welcome back to Base Camp WNC! In our latest update on the tiny house project, we've made significant progress. Since our last update, the plumbing installation is nearly complete. The interior now boasts new paneling, and Carl has been hard at work crafting the cabinets right on site. A designated space for the refrigerator and the stove has been set up, and the sink installation area is ready. In the bathroom, we've installed the drywall and are preparing to mount the fixtures and the toilet. Outside, the electrical infrastructure is coming along, with trenches dug and power lines installed over the past two weeks, connecting us to the main poles. Although wiring isn't fully complete, power has been established at the main box. Our water supply line from the well is in place, and we're finishing the remaining connections. This includes the water and drain lines, which are essential for winterizing the home. The septic tank installation is another milestone, with all the necessary plumbing hook-ups and a cleanout installed for maintenance ease. Despite the challenges of incoming weather, we're pressing ahead. I plan to cover the installation of the septic tank's drain field in an upcoming video. With heavy rain forecasted, we've also taken precautionary measures to prevent the empty septic tank from shifting by filling it partially with water. As always, I'll continue to document our journey, including the installation of the sewer line and ensuring proper grading beneath the tiny house. Our next big task will involve landscaping and installing the underpinning. Thank you for following our progress! Don't forget to like, share, and subscribe for more updates. If you have any questions or comments, feel free to post them. I look forward to sharing more with you in our next video. Thank you for watching! Visit us at: Carolina Homestead Planner. I offer homestead consulting and self-reliant lifestyle planning.
0 Comments
Leave a Reply. |